Scorpion Ribs
Building tomorrow's RIBs today

Web:
www.scorpionribs.com

The GRP lay -up workshop alongside the research and development workshop. Layouts and lofting are undertaken in these workshops under the watchful eye of Chris an expert shipwright.

The photo shows a laminator at work and the longitudinal and transverse stringers in place on a 8.5m boat.

The two workshops cover some 500 sq m.

 


Scorpion Ribs

[ construction methods ]            [ works photo gallery ] 
RIB Insurance
Next Photo